An export quotation lists a 1000 VA uninterruptible power supply. The buyer asks whether it can keep a controller and network equipment running for twenty minutes. The rating is relevant to the load the UPS can support, but it does not provide the requested time. A power rating and an energy supply answer different questions.
For a useful comparison, collect the UPS's VA and watt limits, the connected load's real and apparent power, and runtime information for the exact UPS and battery configuration. A nominal battery energy figure can support an explanatory calculation. It cannot replace the manufacturer's applicable runtime information or an agreed acceptance test.
VA, watts and watt-hours belong in different columns
Watts describe real power. Volt-amperes describe apparent power. Watt-hours describe energy. Dividing an energy quantity by a power quantity gives a time, but a VA rating alone contains no energy quantity to divide.
Eaton's explanation of VA and watts gives the relationship `W = VA × power factor`, or `VA = W / power factor`. For a stated load under the relevant operating conditions, the power factor connects its real and apparent power.
A UPS also has its own output limits. Both relevant limits need to be respected. Do not use a device's wattage as if it were its VA demand, or use the ratio between a UPS's two capacity ratings as if it measured the connected equipment's power factor.
| Quantity | Example unit | Purchasing question |
|---|---|---|
| Real power | W | How much real power does the load require, and can the UPS supply it? |
| Apparent power | VA | What apparent power must the UPS support? |
| Energy | Wh | What energy basis is being stated, and under what conditions? |
| Runtime | Minutes | How long will the specified configuration support the stated load? |
The table is a description of quantities. It is not a complete electrical installation or UPS selection specification.
Two equal VA ratings can conceal different watt limits
Consider two fictional products, used only to illustrate the comparison:
| Illustrative UPS | VA rating | Watt rating |
|---|---|---|
| Unit A | 1000 VA | 600 W |
| Unit B | 1000 VA | 900 W |
Now suppose a fictional steady load requires 750 W at a power factor of 0.95. Its apparent power is approximately `750 / 0.95 = 789.47 VA`.
That calculated VA demand is below both 1000 VA ratings. The 750 W real-power demand exceeds Unit A's 600 W rating. Comparing only the VA headline would miss the problem. Unit B's two displayed limits are not exceeded by this simplified steady load, but that does not complete its selection: startup behaviour, output compatibility, runtime, environment and the actual application still need review.
These numbers are not product recommendations. They show why a supplier's comparison should retain both ratings and describe the load rather than declaring equal capacity from one column.
The same discipline applies when a page lists a family of models. A high watt rating belonging to one model must not be combined with a longer runtime belonging to another battery arrangement.
A battery figure is not delivered backup time
Schneider Electric's UPS buying guide describes runtime as the period a UPS can support connected equipment during an outage and notes that the connected load affects it. That is the scope of the guide used here. A generic buying guide is not a runtime curve for a particular order.
Imagine a separate fictional energy calculation: nominal stored energy of 150 Wh, an assumed fixed 80% delivery factor and a constant 400 W load. The calculation is:
`150 Wh × 0.80 / 400 W = 0.30 hours = 18 minutes`.
The 80% factor is invented for the arithmetic. It is not a measured efficiency, a battery specification or a recommended planning allowance. The example shows how units produce a time. It does not show that a real UPS with a nominal 150 Wh battery will deliver eighteen minutes.
Actual usable energy and operation depend on the equipment and conditions. A manufacturer's runtime information can account for a configuration and load in ways this simplified calculation does not. Battery age, temperature, discharge conditions, protective cutoffs and the UPS's own consumption can matter. The [battery capacity guide](/news/a-battery-capacity-figure-needs-a-discharge-rate-and-an-endpoint) explains why the conditions behind a battery number must remain visible.
Ask what needs to happen during the backup period
“Twenty minutes” should connect to a task. Does the equipment need to finish an operation, maintain communications or complete an orderly shutdown? Those are different acceptance scenarios, even when the quoted duration is the same.
Identify the actual equipment, operating state and load profile. Retain which outlets are battery-backed rather than assuming every socket supplies backup power. Confirm the exact battery configuration and the relevant manufacturer information for that configuration.
A buyer should also distinguish continuous operation from the transition into backup mode. A runtime claim does not, by itself, establish that a particular controller, machine or process tolerates the transfer behaviour and output characteristics of the proposed equipment.
Electrical compatibility is a separate review. Voltage, frequency, connection, protective arrangements and applicable installation requirements do not disappear because a VA value looks sufficient. A [machine's electrical supply definition](/news/a-30-kw-machine-still-needs-an-electrical-supply-definition) needs its own approved information. This article concerns reading and publishing specifications, not wiring a system or approving a critical installation.
Read a runtime chart as a configuration claim
A useful chart identifies the model, battery arrangement, load axis, time axis and applicable conditions. Save the source and revision. If a table distinguishes internal and external battery configurations, keep those rows separate.
Do not read a point at a lighter load and attach it to a heavier load's capacity statement. If the required load lies between published points, ask how the manufacturer intends the chart to be used. Avoid inventing a linear relationship between load and runtime from two convenient points.
An estimated runtime shown by a running device is another type of evidence. It concerns that device's current estimate and operating state. A screenshot without the configuration and load context does not become a family-wide guaranteed specification.
For a procurement comparison, a missing runtime should remain missing. It should not be filled with a value from another product carrying the same VA rating.
Build a short acceptance brief
- Describe the backed-up task. Identify the equipment and the required behaviour during an outage and recovery.
- Record the load. Obtain the relevant real and apparent power information, operating states and startup requirements.
- Identify the exact offer. Record the UPS model, region-specific configuration, battery arrangement and required accessories.
- Check the capacity claims. Compare the relevant VA and watt limits without confusing capacity ratios with measured load power factor.
- Obtain runtime evidence. Use the applicable manufacturer curve, report or an agreed test, with the load and conditions recorded.
- Agree the pass condition. Define the required duration and completed task, the test configuration and who approves electrical and application suitability.
An editorial acceptance check can be simpler than a physical test. Give a reviewer the public comparison and ask them to recover the exact configuration behind the runtime. They should also identify whether the displayed time is a calculation, a manufacturer value, a device estimate or an actual test result.
Those distinctions make an English page more useful to a buyer comparing suppliers. They also make it possible to check an AI-generated summary against the page instead of accepting a sentence that joined unrelated specifications.
Xindar's [B2B export marketing work](/services/export-marketing) can help organize approved product information and the inquiry path. The manufacturer and responsible application team supply and approve the electrical and runtime claims. Publishing a clearer table is not a UPS performance certification.
Questions buyers often ask
Does 1000 VA mean 1000 W?
It does not establish a 1000 W output rating. Read the specified watt rating as well, and assess the connected load's real and apparent power under the relevant conditions.
Can two 1000 VA models have different runtimes?
Yes. The shared VA number does not define their battery energy, configuration or performance at the required load. Obtain runtime information for each exact offer.
Can I promise runtime by dividing nominal battery Wh by equipment watts?
That division can explain the relationship between energy and power. Without an applicable model and conditions, it does not establish delivered runtime. Keep an illustrative estimate separate from an accepted product claim.
Does meeting the steady-state ratings complete the selection?
No. The required operation, transition behaviour, environment, compatibility and applicable technical acceptance remain part of the project. Have the responsible parties review them.
Sources and editorial boundary
Sources checked November 21, 2026: the linked Eaton power definitions and Schneider Electric runtime explanation. The two UPS units, load and energy calculation are fictional. No UPS was installed, load-tested or endorsed for a particular application in preparing this article.